1. Manual assignment in the production order

 

2. Assignment of component to production operation → assigned work center → assigned production supply area → assigned storage location

 

3. BOM item → assigned production supply area → assigned storage location

 

4. Material master (MRP 2 view)

 

 

Posted by 하이안
,